The hall on the Eastern side of the building was rebuilt as a two story structure with a worship centre on the top floor and the TAC offices and meeting rooms on the ground floor.
Offices for our Pastors and a new lobby are at a middle level on The Boulevarde frontage. The car park has been remodelled and landscaped with four parking spaces allocated for disabled people
Follow the link to see a pdf file of each of the floor plans in the new building.
